TOTAL Antwerp – Belgium

T/A 2017 NC3 Project - Mechanical Works ROG Lot B

TOTAL Antwerp

YEAR: 2017


CLIENT: TOTAL


LOCATION: TOTAL Raffinaderij ANTWERPEN


PROJECT: T/A 2017 NC3 Project - Mechanical Works ROG Lot B


SCOPE OF WORKS:

Piping Prefabrication and Erection | Valves Replacement |

General Maintenance of  Exchangers, reactors, Filters and Drums, Columns| Mechanical works for testing


MANHOURS (Total): 45.000 h


MANPOWER PICK (Total): 90 units


WORK SCHEDULES: March 2017 – June 2017

LUKOIL Priolo G. (SR) - Italy

T/A 2015 Lot 2 - Isab South Plant Refinery

LUKOIL Priolo

YEAR: 2014


CLIENT: ISAB S.R.L.


LOCATION: ISAB SOUTH PLANT RAFINERY PRIOLO GARGALLO (SR) - Italy 


PROJECT: T/A 2015 Lot.2 Plants 500-1000-1600 vis


SCOPE OF WORKS: Piping Dismantling, Prefabrication and Erection; Valves Dismantling and reinstallation; General Maintenance of Exchangers, Airfins, Columns, Vessels, Filters and Furnaces;


MECHANICAL MANHOURS: 255.000 h


MANPOWER PICK: 650 units


WORK SCHEDULES: July 2014 – March 2015 (SHUTDOWN March 2015)


WORKS INCLUDED: Scaffolding, Insulation, NDT, Water Blasting, Chemical Cleaning, Painting, Refractory, Decoking, Electrical instrument works, Bolt Tensioning, Industrial Cleaning Services, INAIL documentation for design modification on equipment, Boring, Civil works. 

RM S.C.p.A. Milazzo (ME) - Italy

FCC Revamp project: Mechanical works

RM S.C.p.A. Milazzo

YEAR: 2014


CLIENT: RM S.C.p.A..


LOCATION: Milazzo RAM Refinery (ME) - Italy


PROJECT: FCC Revamp project: Mechanical works


SCOPE OF WORKS: Mechanical works (construction of the new reactor dome with a shell course for the replacement of the existing uppert part), Erection of Equipment, Piping and special large bore lines; Erection and  Dismantling of temporary steel structures; General Maintenance of Exchangers, Airfins, Columns, Vessels, Filters and Furnaces;


MECHANICAL MANHOURS: 122.000 h


MANPOWER PICK: 250 units


WORK SCHEDULES: May 2014 – July 2015 (SHUTDOWN May-July 2015)


WORKS INCLUDED: Scaffolding, Insulation, NDT, Water Blasting, Chemical Cleaning, Painting, Refractory, Electrical
instrument works, Hydrodynamic Cutting, Bolt Tensioning, Industrial Cleaning Services, INAIL documentation for
design modification on equipment, Civil works.

ENEL S.p.A. Porto Empedocle (AG)- Italy

Installation Gas Turbine General Eletric

ENEL S.p.A.?Porto Empedocle

YEAR: 2014


CLIENT: ENEL S.p.A.


LOCATION: Porto Empedocle (AG) - Italy


PROJECT: Installation Gas Turbine General Electric Frame 6FA


SCOPE OF WORKS: Gas Turbine Package: 888.561 Kg |

Methane measuring and compressor station: 228.000 Kg |
Piping supply, prefabrication and erection: 100.000 Kg |

Electrical instrument Erection of turbogas and methane stations


MECHANICAL MANHOURS: 60.000 h


MANPOWER PICK (Total): 180 units


WORK SCHEDULES: May 2014 – December 2014

ESSO S.r.L. Augusta (SR) - Italy

FCC Revamping: Mechanical works Catalitic T/A 2014

ESSO S.r.L. Augusta

YEAR: 2013


CLIENT: ESSO S.r.L.


LOCATION: Augusta Refinery (SR) - Italy


PROJECT: FCC Revamping: Mechanical works Catalitic T/A 2014


SCOPE OF WORKS: Piping Prefabrication and Erection |

Erection and Dismantling of temporary steel structures |
Dismantling and Re installation of over-head line |

General Maintenance of Exchangers, Airfins, and Furnaces |
Dismantling and Re installation with replacement of Cyclones, dipleg, trickle valves of Reactor and Regenerator Dome.


MANHOURS (Total): 85.000 h


MANPOWER PICK (Total): 230 units


WORK SCHEDULES: July 2013 – April 2014 (Shutdown April 2014)


WORKS INCLUDED: Bolt Tensioning, NDT, Water Blasting, Chemical Cleaning, Painting, Hydrodynamic Cutting,
INAIL documentation, Industrial Cleaning Services.

ISAB S.r.L. Priolo G. (SR) - Italy

General Shutdown LOT 1 - Isab North Plant Refinery

ISAB S.r.L. Priolo

YEAR: 2012


CLIENT: ISAB S.R.L.


LOCATION: ISAB NORTH PLANT REFINERY, PRIOLO G. (SR) - Italy


PROJECT: Mechanical Works - General Shutdown LOT 1: CR 26, CR 28, CR 35, CR 36, PR 1, FLARE


SCOPE OF WORKS: Piping Dismantling Prefabrication and Erection; General Maintenance of Exchangers, Airfins, Columns, Drums,

Furnaces and Reactors; Dismantling and reinstallation of Valves.


MANHOURS: 160.000 h


MANPOWER PICK: 550 units


WORK SCHEDULES: November 2012 – March 2013 (SHUTDOWN March 2013)


WORKS INCLUDED: Scaffolding, Insulation, Bolt Tensioning, NDT, Water Blasting, Chemical Cleaning, Painting,
Services, Electrical instrument works, Refractory, Industrial Cleaning Services, INAIL documentation for design
modification on equipment, Civil works.

ESSO S.r.L. Augusta (SR) - Italy

Mechanical works Co-generation system

ESSO S.r.L.?Augusta

YEAR: 2012


CLIENT: FWI / ESSO


LOCATION: Augusta Refinery (SR) - Italy


PROJECT: Mechanical works_Co-generation system


SCOPE OF WORKS: Heat Recovery Steam Generator Package |

Gas turbine Package |

Equipment installation |

BOP |

Steel structure and piping erection |

Prefabrication and Erection of Pipe support.


MECHANICAL MANHOURS: 153.000 h


MANPOWER PICK (Total): 160 units


WORK SCHEDULES: October 2012 – July 2013

I nostri principali Clienti

120
121
esso
api
total
saipem
enel power
eni
fw
sasol
omw
technip
120
121
rm
snam progetti
ansaldo energia
lukoil
tamoil
RITpiattaforma_2A3_quad-piccola-20140318_162118A6ZZZquad-piccola-20140415_130807B_17324420x20B2_20140422_151328B_18223920x20A5_20x20-CopiaRITpiattaforma3A4_VV2-20x20B_17311220x20A8_ZZZgrandequad-20140417_121707B_17383220x20B5_20130317_140149A7_VV3-20x20B1_20140423_155649B7_DSC03345RITpiattaforma1B3_20140422_152611B8_DSC03346B9_DSC03338piattaforma_A23000520140118_RIT60x40C1_DSCN171060x40progetti internii nostri progettiprogetti gruppo iremprogetti sonim
sonim irem group

BRANCH OFFICE ROMANIA

Sucursala Bucuresti
Strada Biharia n° 26, Biroul 31, Etaj 4
13981 Sectorul 1 Bucuresti
TVA: RO35236552

BRANCH OFFICE BELGIO

Belgium Branch

NIJVERHEIDSSTRAAT 54H,
2160 WOMMELGEM
VAT: BE 0649.952.953

BRANCH OFFICE BULGARIA

 

 

Branch Office Bulgaria

Tzar Boris III Blvd. n. 165/A ,

1618 SOFIA
VAT:  BG204899333

 

C.da Biggemi, Ex Strada Statale 114 n°84
96010 Priolo Gargallo (SR) ITALY
Tel. 0931 1819701 
Fax 0931 1819700 

P.  IVA: 01233930898​

Capitale Sociale 100.000,00 i.v.

www.iremspa.it

  PRIVACY POLICY INFO COOKIE POLICY  |  CREATED BY FLAZIO EXPERIENCE

Create a website